ALMM List-II 2026: What Solar Manufacturers Need to Know

0
SOLAR MANUFACTURING • MNRE • ALMM 2026

ALMM List-II 2026: What Solar Manufacturers Need to Know

A practical guide to MNRE ALMM List-II for solar PV cells, including cell sourcing, manufacturer verification, traceability, IQC, DCR, BOM control and compliance requirements for Indian solar module manufacturers.

India's solar manufacturing industry has entered a new compliance phase with the introduction of ALMM List-II for solar PV cells. The first ALMM List-II for solar PV cells was issued on 31 July 2025, and MNRE has continued updating the list through multiple revisions. For module manufacturers, this means cell procurement is no longer only a technical and commercial decision. Depending on the applicable project requirements, manufacturers must also consider the relevant ALMM eligibility, model, traceability and documentation.
Quick Answer: What Is ALMM List-II?

ALMM List-II is the MNRE list covering approved solar PV cell manufacturers and models under the Approved List of Models and Manufacturers framework.

ALMM List-I covers solar PV modules, while ALMM List-II covers solar PV cells. The first ALMM List-II for cells was issued on 31 July 2025 and is being updated regularly.

What Is ALMM List-II?

ALMM stands for Approved List of Models and Manufacturers.

The framework was introduced by the Ministry of New and Renewable Energy (MNRE) to establish an approved list of eligible solar PV models and manufacturers.

ALMM List-I

Covers eligible solar PV modules.

ALMM List-II

Covers eligible solar PV cells.

MNRE's official ALMM page states that the first ALMM list for solar PV modules was issued on 10 March 2021, while the first ALMM list for solar PV cells was issued on 31 July 2025.

Why Was ALMM List-II Introduced?

Solar PV modules are long-life products. Their performance, warranty and traceability can depend heavily on the quality and origin of their constituent materials, including solar cells.

For manufacturers and project stakeholders, a controlled approval framework can help improve:

Traceability

Identification of cell manufacturer and model.

Quality Control

Better control of approved cell sourcing and documentation.

Compliance

Supports applicable project and government requirements.

Manufacturing Control

Encourages controlled supplier and material management.

ALMM List-II 2026: Current Status

MNRE is regularly updating ALMM List-II for solar PV cells. The official ALMM page currently lists the 11th Revision of ALMM List-II dated 05 October 2026.

Revision Date Product
First ALMM List-II 31 July 2025 Solar PV Cells
5th Revision 13 February 2026 Solar PV Cells
8th Revision 22 July 2026 Solar PV Cells
9th Revision 21 August 2026 Solar PV Cells
10th Revision 28 September 2026 Solar PV Cells
11th Revision 05 October 2026 Solar PV Cells
Important: ALMM List-II is being updated regularly. Solar manufacturers should therefore avoid relying on an old downloaded list when checking current eligibility.

When Did ALMM List-II Become Important?

The implementation of ALMM List-II became particularly important from 1 June 2026.

MNRE subsequently issued clarifications concerning the implementation and transition arrangements.

Important clarification: There is no blanket extension of ALMM List-II. MNRE has provided a limited window until 31 December 2026 for commissioning certain Net-Metering and Open Access renewable-energy projects under the specified transition provisions.

Therefore, manufacturers should not interpret 31 December 2026 as a universal postponement of ALMM List-II requirements.

ALMM List-I vs ALMM List-II

Parameter ALMM List-I ALMM List-II
Product Solar PV Modules Solar PV Cells
Manufacturer Module Manufacturer Cell Manufacturer
Model Module Model Cell Model
First List 10 March 2021 31 July 2025
Updates Regular Regular
Manufacturing Impact Module Eligibility Cell Sourcing & Eligibility

Depending on the project and applicable government requirements, manufacturers may need to consider both module-level and cell-level ALMM requirements.

What Does ALMM List-II Mean for Solar Module Manufacturers?

The biggest practical change for module manufacturers is stronger control over solar cell procurement.

A procurement team should not ask only:

Old Procurement Question
Is the cell technically suitable for our module?

For applicable projects, the question should become:

Is the cell technically suitable and compliant with the applicable ALMM/project requirements?

How to Verify a Solar Cell Under ALMM List-II

Before purchasing cells, verify the relevant information against the latest applicable MNRE ALMM documentation.

Step 1: Verify the Cell Manufacturer

Confirm that the manufacturer is included in the applicable ALMM List-II.

Step 2: Verify the Exact Cell Model

Do not rely only on the supplier's company name. Check the exact model information against the applicable list.

Step 3: Verify Technology and Format

Confirm the cell technology, format and other controlled technical parameters against your approved specification.

Step 4: Check Project Requirements

Check whether the project has additional requirements such as DCR or other scheme-specific conditions.

Supplier → Manufacturer → Cell Model → ALMM Verification → Project Compliance

Why Cell Traceability Is Important

ALMM-related controls make material traceability increasingly important for module manufacturers.

A robust manufacturing system should ideally connect:

CELL MANUFACTURER ↓ CELL MODEL ↓ CELL BATCH / LOT ↓ INCOMING INSPECTION ↓ PRODUCTION LOT ↓ MODULE SERIAL NUMBER ↓ PACKING LIST ↓ CUSTOMER / PROJECT

The same information should also be retrievable in reverse when investigating a customer complaint or quality issue.

Cell batch → Module serial number should be traceable wherever your plant's QMS and ERP/MES architecture permits.

ALMM List-II and Incoming Quality Control

ALMM verification can be incorporated into the IQC checklist for solar cells.

IQC Checkpoint Verification
Supplier Name Match approved supplier
Cell Manufacturer Verify against applicable ALMM documentation
Cell Model Verify exact model
Technology Confirm specification
Cell Dimensions Measure/verify as per specification
Visual Quality Inspect incoming material
EL Quality Perform applicable sampling/inspection
IV Parameters Verify as applicable
Batch / Lot Record traceability information
CoA / CoC Verify applicable documents
Project Requirement Check ALMM/DCR/project conditions

ALMM vs DCR: Do Not Confuse Them

One of the most important points for solar manufacturers is that ALMM and DCR are not the same requirement.

ALMM

Relates to the approved models and manufacturers under the applicable ALMM framework.

DCR

Refers to applicable domestic-content requirements under a particular scheme or programme.

Remember: ALMM-listed does not automatically mean DCR compliant. These requirements should be checked separately according to the applicable project or scheme.

ALMM List-II and Solar Module BOM Control

The cell should be properly controlled within the manufacturing BOM.

BOM Parameter Example Control
Cell Technology TOPCon / HJT / Other approved technology
Cell Type N-type / applicable type
Cell Format Controlled approved format
Cell Manufacturer Approved supplier/manufacturer
Cell Model Controlled model
Efficiency Approved specification
ALMM Status Verified where applicable
DCR Status Project-specific verification

Engineering Change Control for Cell Substitution

Suppose a module manufacturer normally uses one approved TOPCon cell supplier but procurement wants to replace it with another supplier.

Even if the replacement cell appears technically similar, it should not automatically be treated as an unrestricted material substitution.

Change Request → Technical Evaluation → ALMM Verification → Qualification → BOM Revision → Production Release

TOPCon, HJT and Cell Formats

India's solar cell manufacturing ecosystem is expanding across different cell technologies and formats.

TOPCon

Tunnel Oxide Passivated Contact technology used widely in current n-type cell manufacturing.

HJT

Heterojunction Technology combining crystalline silicon with thin amorphous-silicon layers.

G12R

A newer rectangular cell format increasingly relevant to high-power module designs.

Other Technologies

Cell technologies and formats should always be verified against the applicable controlled specification and current ALMM documentation.

Changing the cell technology or format can affect module design, string configuration, electrical parameters, interconnection, dimensions and certification.

Proposed MNRE Solar Cell Nomenclature 2026

MNRE is currently seeking stakeholder comments on a proposed standardized nomenclature for Solar PV Cell Models under ALMM List-II.

The official MNRE consultation notice shows a start date of 06 October 2026 and an end date of 04 December 2026.

Important: This nomenclature is currently a proposal under stakeholder consultation. Manufacturers should not treat the proposed coding system as a finalized mandatory requirement until MNRE issues the applicable final direction.

If finalized, standardized nomenclature could make solar cell model identification and traceability easier for manufacturers, module producers, procurement teams, QA/QC departments and auditors.

What Should QA/QC Teams Do Now?

Solar manufacturing quality teams can prepare by integrating ALMM verification into their existing QMS and material-control procedures.

  • Create an ALMM verification checklist.
  • Maintain an approved cell supplier list.
  • Verify exact cell models.
  • Add applicable ALMM verification to IQC.
  • Maintain cell batch and lot traceability.
  • Link cell batches with production records.
  • Control supplier and cell substitutions.
  • Monitor MNRE ALMM revisions.
  • Maintain audit-ready documentation.

ALMM List-II Procurement Checklist

Before Purchase Order

  • Check current applicable ALMM List-II.
  • Verify cell manufacturer.
  • Verify exact cell model.
  • Confirm cell technology.
  • Confirm cell format.
  • Check project requirements.
  • Check DCR requirements separately.
  • Obtain required supplier documentation.

During Material Receipt

  • Verify supplier.
  • Verify manufacturer.
  • Verify model.
  • Verify batch/lot.
  • Check packing documents.
  • Perform IQC.
  • Record material traceability.

Before Production

  • Confirm material approval.
  • Confirm BOM.
  • Confirm engineering approval.
  • Confirm project-specific compliance.

What Should Manufacturers Prepare for Audits?

A good audit-ready system should be able to answer five basic questions.

1. Where Did the Cell Come From?

Supplier and manufacturer records.

2. Which Model Was Used?

Purchase and material records.

3. Was It Eligible?

Applicable ALMM/project compliance evidence.

4. Which Modules Used It?

Production and batch traceability.

5. Which Customer Received Those Modules?
Dispatch, packing list and ERP/customer records should provide the required traceability.

This forward and backward traceability is valuable for NCR investigations, CAPA, warranty claims, customer complaints and compliance audits.

ALMM List-II 2026 Compliance Checklist

Requirement Status
Current MNRE ALMM List-II available ☐
Approved cell supplier list updated ☐
Exact cell model verified ☐
Cell technology verified ☐
Cell format verified ☐
Supplier documents available ☐
IQC checklist updated ☐
Cell batch traceability available ☐
Production traceability available ☐
BOM controlled ☐
Engineering change procedure implemented ☐
DCR requirement separately checked ☐
Customer/project requirements verified ☐
ALMM revision monitoring assigned ☐
Audit records maintained ☐

Related Solar Manufacturing Guides

Solar Module Manufacturing BOM

Understand the major components and material structure used in solar PV module manufacturing.

Solar Cell Sizes: M10, M10R, G12 and G12R

Learn what the M and G designations mean in modern solar cell formats.

Solar Radiation vs Irradiance vs Irradiation

Understand important solar-energy measurement terminology used in PV engineering.

Solar Panel STC vs NOCT

Understand the difference between laboratory STC ratings and more realistic operating conditions.

Final Takeaway

ALMM List-II 2026 is not simply a list that solar cell manufacturers need to monitor.

For applicable projects, it can directly influence how solar module manufacturers purchase, qualify, inspect, trace and document solar cells.

The practical manufacturing workflow should therefore be:

Supplier Selection → ALMM Verification → Technical Approval → Purchase → IQC → Traceability → Production → Dispatch

With MNRE continuing to revise ALMM List-II and consulting stakeholders on standardized solar cell nomenclature, cell identification, supplier control and traceability are becoming increasingly important parts of the Indian PV manufacturing quality system.

Frequently Asked Questions

What is ALMM List-II?

ALMM List-II is the MNRE list covering approved solar PV cell manufacturers and models under the ALMM framework.

When was the first ALMM List-II issued?

The first ALMM List-II for solar PV cells was issued on 31 July 2025.

What is the latest ALMM List-II revision in 2026?

MNRE's official ALMM page currently lists the 11th Revision of ALMM List-II for Solar PV Cells dated 05 October 2026.

Is ALMM List-II the same as DCR?

No. ALMM and DCR are separate requirements. The applicable project or scheme requirements should be checked independently.

Can manufacturers use any domestic solar cell?

Not necessarily. For projects where ALMM List-II applies, manufacturers should verify the applicable manufacturer and cell model against the current MNRE requirements.

Is 31 December 2026 a blanket extension of ALMM List-II?

No. MNRE describes the provision as a limited window for specified Net-Metering and Open Access renewable-energy projects. It should not be treated as a universal extension.

Is MNRE introducing a solar cell code?

MNRE is currently consulting stakeholders on a proposed standardized nomenclature for Solar PV Cell Models under ALMM List-II. The current official consultation is dated 06 October 2026 to 04 December 2026.

Why is cell traceability important?

Cell traceability helps manufacturers connect the cell manufacturer and batch with production lots and module serial numbers. This is useful for quality investigations, customer complaints, warranty cases and audits.

Official References
  • Ministry of New and Renewable Energy (MNRE) – Approved List of Models and Manufacturers (ALMM)
  • MNRE – Request for comments on proposed standardized nomenclature for Solar PV Cell Models under ALMM List-II
  • MNRE – ALMM List-II revisions and implementation notices

Always refer to the latest applicable MNRE notification, ALMM list and project-specific requirements before making procurement or compliance decisions.

Post a Comment

0 Comments

Post a Comment (0)

#buttons=(Ok, Go it!) #days=(20)

Our website uses cookies to enhance your experience. Check Now
Ok, Go it!